  1. Predictive Engineering Newsletter

    You Don't Have to Dive and Catch: What a Flawless Launch Looks Like

    Created on Nov 9, 2026By Dr. Eric Maass

    Before DFSS, a typical new Motorola product saw a median of seven major customer issues or stop ships after launch. With DFSS that median dropped to two, and Bob Epson's "Flawless Launch" became the goal: high yield at launch, with no post-launch quality or supply issues for at least six months.

  2. How to Choose a Lean Six Sigma Training Provider in the Philippines

    Created on Nov 7, 2026By Six Sigma BELT Guru

    A practical checklist for Philippine employers and professionals choosing Lean Six Sigma training: accreditation, training vs certification, project coaching, prerequisites, delivery options, and how to verify credentials.

  3. Predictive Engineering Newsletter

    The DFSS (Predictive Engineering) Flowchart

    Created on Oct 31, 2026By Dr. Eric Maass

    A rational order for DFSS / predictive engineering tools, from Voice of the Customer and P-diagrams through MSA, DOE, Monte Carlo and Design for Reliability, and why sequence matters as much as the tools themselves.

  4. Predictive Engineering Newsletter

    Multiple Response Optimization for a Communication Device

    Created on Oct 1, 2026By Dr. Eric Maass

    How a Motorola DFSS team in Penang used simulation, DOE and Monte Carlo optimization to meet multiple ruggedness requirements for the Covert communication device, and achieve a Flawless Launch.

  5. Predictive Engineering Newsletter

    Three Black Belt Projects, Three Predictive Engineering Wins

    Created on Sep 14, 2026By Dr. Eric Maass

    Three DFSS Black Belt projects at a Medtronic site in Colorado, in software, reliability and manufacturing, that helped StealthStation S8 achieve a Flawless Launch.

  6. Your Significant X’s

    Created on Nov 19, 2024By Alvin Villegas

    The old adage goes: "A problem that is well stated is a problem half-solved" (Charles Kettering). The other half?

  7. The Crossroads – Lean Six Sigma and Design Thinking

    Created on Oct 6, 2024By Alvin Villegas

    I have long been fascinated by how business process improvement and operational excellence methodologies have evolved over the years.

  8. The Persona in a Continuous Improvement Project

    Created on Sep 6, 2024By Alvin Villegas

    I was standing in front of an operator, observing the process improvement we had implemented on a production module (a TV line). The project was for a large Japanese consumer electronics company based in Jakarta, Indonesia.

  9. Overcoming the Challenges of Brainstorming

    Created on Mar 12, 2024By Jodl Gayatin

    As a Green Belt, the projects you usually lead are "just-do-it" projects where the solutions are fairly straightforward. The necessary action needs no further analysis and is only a matter of implementation.

Public training calendar

Looking for a certificationprogram?

Browse public programs and request the next schedule announcement.

View training & schedules

Continue the conversation.

Explore ideas that help teams improve processes, customer experience, and performance.

Contact us

Event

Process efficiency and the customer experience

A coach pointing out performance data on a monitor to a colleague at his workstation

Customer experience is often shaped well before a customer reaches a frontline channel. Process design, handoffs, decision rights, and access to accurate information all influence the effort required to get a request completed.

This practitioner conversation explores how teams can trace customer friction back into the operating process, distinguish symptoms from underlying causes, and prioritize improvements that are practical for both the customer and the people doing the work.

Event

Making operational improvements last

Three supervisors in safety vests reviewing a tablet beside a bottling line

A conversation about process ownership, performance reviews, and sustaining gains.

Blog

You Don't Have to Dive and Catch: What a Flawless Launch Looks Like

Created on Nov 9, 2026By Dr. Eric Maass

Charts of post-launch customer issues, including a trend of customer issues over time and a boxplot comparing post-launch issues before DFSS and with DFSS

Originally published in Dr. Eric Maass's Predictive Engineering Newsletter (Design for Six Sigma and Supply Chain Resilience). Dr. Maass is Six Sigma BELT Guru's Master Black Belt certifying partner. Republished with credit.

Last edition walked through the DFSS Flowchart, with the predictive engineering tools in the order they tend to work best. This edition looks at how predictive engineering effort pays off - with a "Flawless Launch". The research and development teams share a common, challenging goal, and celebrate together when the product successfully launches - without yield issues, without supply chain issues, without product quality issues...shipping product instead of fighting fires.

The anchor: You Don't Have to Dive and Catch: What a Flawless Launch Looks Like

Charts of post-launch customer issues, including a trend of customer issues over time and a boxplot comparing post-launch issues before DFSS and with DFSS

In June 2006, Robert Epson, Senior VP of Motorola Government & Public Safety, explained why his organization had made DFSS a requirement for every new product: "If you do the job right the first time, the probability of problems becomes smaller. You don't have to dive and catch."

The data backed him up. Before DFSS, a typical new product in that organization experienced a median of seven major customer issues or stop ships after launch. With DFSS, the median post-launch issues dropped to two. The difference was statistically significant by a t-test, a Mann-Whitney test, and ordinal logistic regression. Moreover, using DFSS, nearly all of the post-launch issues involving hardware (electronics and mechanical) disappeared - the median of 2 post launch issues consisted almost entirely of software and firmware issues (where DFSS had not been used).

Schedule risk improved as well. We asked each project manager, for each of 14 new product using DFSS from 2006 and 2007, to summarize the impact of DFSS on the schedule. According to the project managers, about 2/3 of the time (9 of the 14 projects) - DFSS had a favorable impact on their project schedule. For the remaining 5 projects, 36%, the project managers said DFSS had neither a favorable nor unfavorable impact. The project managers asserted they had not observed any project where DFSS had an unfavorable impact on the schedule. This was a pleasant surprise for me. One project manager said "saved 5 weeks", another said "shipped 4 weeks early", yet another "saved three to six months in the schedule."

By September 2007, Epson's assessment was simple: "Our investment in quality improvements on our core products and DFSS on new products is paying off."

Bob Epson coined the term "Flawless Launch" - aligned with his leadership team's definition of a successful product launch: high yield at launch, and no post-launch quality or supply issues for at least 6 months.

A Flawless Launch comes from R&D engineering and manufacturing working together, so that robust, reliable designs turn into high-quality products delivered on time and without major post launch issues.

Diagram of a Flawless Launch from R&D engineering and manufacturing collaboration, combining robust, reliable product designs with on-time delivery and high-quality products

Medtronic's StealthStation S8 surgical navigation system is an example. Eleven DFSS projects, five Black Belt and six Green Belt, covered design, reliability, and manufacturing. Mean time between failures doubled to 4 years compared with the prior product, and latency (from when the surgeon to an action until it was seen on the display overlaid on an MRI or CT-scan) improved by more than 77% - such that the delay was virtually imperceptible. Customers - neurosurgeons and their staff - were impressed and pleased! On the manufacturing side, savings the first year alone reached about half a million dollars.

I share more of these stories, and the methods behind them, in my very brief (92 pages) book, Flawless Launches: Profitable Products. And I may also share some additional examples and stories in future editions of this newsletter.

Learn more about Flawless Launches

— Eric Maass

From the field: FDA Warning Letter Shows What Happens When Changes Go Unvalidated

On Oct. 27, FDA posted warning letters to three medical device manufacturers, including an issue with nonsterile ultrasound gels.

FDA cited inadequate contamination controls and a reformulated gel whose changes were neither validated nor cleared through a new 510(k). The agency also pointed to repeated failures in environmental monitoring, investigations, and corrective actions, even after contamination was confirmed and customers had complained, along with a failure to report a correction involving contaminated product.

Why it matters: a launch is only as good as the controls that follow it. The evidence a team builds during development describes the product as designed. Once a formulation or process changes without validation, that evidence no longer covers what is actually shipping.

The other two letters cited a manufacturer marketing disinfection devices without premarket authorization and a firm promoting an eyelid cleaning device for unapproved uses.

Read the full story

Links worth bookmarking

© Proprein Labs 2026. Learn more at 6sigmaexperts.com or connect with Eric Maass on LinkedIn.

Blog

How to Choose a Lean Six Sigma Training Provider in the Philippines

Created on Nov 7, 2026By Six Sigma BELT Guru

Choosing a Lean Six Sigma training provider in the Philippines is less about marketing claims and more about fit: who will teach your people, what credential they will earn, how projects get coached, and whether an employer can verify the result later.

This guide is a decision checklist. Use it to compare providers before you enroll a cohort or buy an in-house program.

1. Decide the outcome you need

Be clear whether you need:

  • Awareness and a common language for people who support improvement work (often Yellow Belt).
  • Project leaders who can run structured DMAIC projects part-time (often Green Belt).
  • Advanced project leaders for complex, cross-functional work (often Black Belt).
  • Enterprise capability builders who coach others and govern a portfolio (often Master Black Belt).

Mismatching the belt to the role is a common reason programs fail to produce usable results at work.

2. Separate training from certification

Many buyers assume “training fee = certified.” In practice they are different steps.

Ask every provider:

  • What does the course fee cover (instruction only, exam, project review, coaching)?
  • What must the candidate complete after class to become certified?
  • Is certification open only to the provider’s own trainees, or also to candidates trained elsewhere?
  • How long do candidates have to finish exams or projects?

Example of a clear split (Six Sigma BELT Guru Inc.): course participation and certification are distinct. Yellow Belt certification needs the course and a passed online exam (passing mark 70%); a project is desirable but not required. Green Belt and Black Belt certification also need a completed improvement project signed off by stakeholders and a panel review. Master Black Belt certification follows a passed exam and a separate portfolio-based process with a named certifying partner. Details: Certification.

3. Verify accreditation—and what it covers

Accreditation answers a different question from “do they run good workshops?” It is evidence that a third party reviewed the provider’s training programs against published standards.

Practical checks:

  1. Confirm the provider appears in the accrediting body’s public directory.
  2. Confirm which belts or program types are listed (Yellow, Green, Black, Master Black Belt, online, classroom, on-site).
  3. Confirm the legal business name and contact details match what you see on the provider’s own site.
  4. Do not assume that accreditation of training automatically means the same body personally issues every higher-level certification pathway. Ask who signs or assesses the final credential for each belt.

Six Sigma BELT Guru Inc. states that it is accredited by The Council for Six Sigma Certification (CSSC) for Yellow Belt, Green Belt, Black Belt, and Master Black Belt training. Its public CSSC provider listing is here:
CSSC listing — Six Sigma BELT Guru Inc.

When you check any listing, compare the address and email to the provider’s current website contact page. Directory pages can lag behind office moves.

4. Ask how projects are coached and reviewed

For Green Belt and Black Belt work, classroom hours alone rarely produce a durable credential. Ask:

  • Is project coaching included, optional, or billed separately?
  • Who reviews the project—instructors only, or a panel that includes sponsors and process owners?
  • What minimum project impact or savings criteria (if any) are published?
  • What happens if the candidate’s first project stalls?

Six Sigma BELT Guru Inc. publishes project thresholds and panel expectations for Green Belt and Black Belt on its certification page, including stakeholder sign-off and a panel defense. That transparency makes it easier for HR and sponsors to plan time and sponsorship before class starts.

5. Check prerequisites honestly

A provider that waves every prerequisite may enroll people who cannot complete certification. A provider that documents prerequisites helps candidates self-select.

Typical pattern in the Philippine market (confirm per provider):

LevelCommon entry profile
Yellow BeltNo prior Lean Six Sigma experience required
Green BeltSupervisors, analysts, quality and ops practitioners who will lead projects
Black BeltExperienced Green Belts / leaders of complex cross-functional work
Master Black BeltCertified Black Belts (or equivalent BB knowledge with substantial coaching experience)

Six Sigma BELT Guru Inc. publishes who each public program is for on the belt pages and states Master Black Belt entry as a certified Black Belt or comprehensive Black Belt knowledge with considerable experience implementing, leading, and coaching Lean Six Sigma projects or programs. Master Black Belt exam passing score is 75 within 12 months after training; certification then proceeds with certifying partner Dr. Eric Maass (gap assessment, agreed portfolio deliverables, final assessment). CSSC accreditation of the Master Black Belt training program is separate from that portfolio certification step. Sources: MBB Philippines, Certification, Dr. Eric Maass.

6. Compare delivery options against how your team works

Ask which of these the provider actually offers—and for which belts:

  • Public classes (scheduled open enrollment)
  • In-house / on-site (delivered for your team, often tailored)
  • Live online / instructor-led virtual
  • Fully asynchronous online (if offered)

Also ask where they can deliver. Some Philippine providers train only in Metro Manila classrooms; others travel nationwide or support remote cohorts.

Six Sigma BELT Guru Inc. offers public, in-house, and online options. Its Philippines training page states it delivers in-house and on-site training anywhere in the Philippines and outside the Philippines, and has done so for the past 12 years. Office: 1015 Parkway Corporate Center, Corporate Avenue, Filinvest City, Alabang, Muntinlupa City. Contact: marketing@6sigmabelt.com · 0917-8459678. Sources: Lean Six Sigma Training Philippines, Contact.

7. Read published fees—and what is excluded

Request a fee table that shows:

  • Public-class fee per belt (and whether VAT-inclusive)
  • What the fee excludes (exam retakes, project coaching beyond a limit, travel for in-house)
  • Scholarship or cohort discounts, if any
  • In-house quotation process

Published public-class fees change by schedule; always confirm the live Training page before budgeting.

Illustrative public fees as published on Six Sigma BELT Guru Inc. at draft time (VAT exclusive unless noted; confirm live page):

ProgramTypical public durationExample published public fee
Yellow Belt2 daysFree (Scholarship — 2 per company) on listed scholarship dates
Green Belt5 daysPhp 36,500
Black Belt10 daysPhp 84,000.00
Master Black Belt10 days (often scheduled as half-days)Local Php 125,000.00 ; International USD 2,400.00

Source: Training and Lean Six Sigma Training Philippines. Treat these as examples of fee transparency, not as a permanent price list.

8. Confirm you can verify the credential later

Employers should be able to check a certificate without calling a salesperson.

Ask:

  • Is there a public roster or verification search by name or certificate ID?
  • How long do records remain searchable?
  • What information is shown publicly?

Six Sigma BELT Guru Inc. publishes a certified roster searchable by professional name or certificate ID. Source: Lean Six Sigma Training Philippines (verification FAQ) and the site roster.

9. Evaluate practitioner depth, not slogans

Useful signals:

  • Named consultants with published bios and focus areas
  • Industry coverage that matches yours (manufacturing, services, IT/BPO, healthcare, etc.)
  • Evidence of project coaching and change leadership content—not only tool slides
  • Clear distinction between Lean Six Sigma training and adjacent services (ISO/QMS, productivity, analytics)

Avoid selecting a provider solely because a search engine or AI overview ranked them first. Rankings change; accreditation records, certification rules, and coaching capacity are more durable signals.

10. A short RFP checklist you can send any provider

Copy and send these questions:

  1. Which belts are you accredited for, by which body, and where is the public listing?
  2. What does the quoted fee include and exclude?
  3. What are the exact certification requirements after class for each belt we care about?
  4. Who coaches projects, how many coaching hours are included, and who sits on the panel?
  5. What are the prerequisites and time limits for exams and projects?
  6. Can we verify alumni on a public roster?
  7. Can you deliver public / in-house / online for our locations and schedule?
  8. Who is the named assessor or certifying partner for Master Black Belt (if applicable), and is that the same as the training accreditor?

How Six Sigma BELT Guru Inc. maps to this checklist

Checklist itemSix Sigma BELT Guru Inc. (verified on live site / CSSC directory at draft time)
AccreditationCSSC-accredited private training organization for YB, GB, BB, and MBB training
Training vs certificationExplicitly separated; requirements published per belt
Project coaching / panelGB and BB require stakeholder-signed projects and panel defense
Master Black Belt pathwayCSSC-accredited MBB training; portfolio certification with Dr. Eric Maass as certifying partner
DeliveryPublic, in-house, online; Philippines and outside PH
FeesPublished on Training and belt pages (VAT exclusive)
VerificationPublic roster by name or certificate ID
Office1015 Parkway Corporate Center, Corporate Avenue, Filinvest City, Alabang, Muntinlupa City

For schedules, fees, and registration: Training · Contact.

Blog

The DFSS (Predictive Engineering) Flowchart

Created on Oct 31, 2026By Dr. Eric Maass

DFSS Predictive Engineering flowchart showing charter, VOC, requirements flow-down, transfer functions, optimization and verification steps

Originally published in Dr. Eric Maass's Predictive Engineering Newsletter (Design for Six Sigma and Supply Chain Resilience). Dr. Maass is Six Sigma BELT Guru's Master Black Belt certifying partner. Republished with credit.

This edition is about sequence. When I develop a DFSS Green Belt program, it is very often customized. I first try to get a general understanding of the business, the products and the challenges. Certain tools are most useful for certain challenges, and the sequence of the tools often makes as much a difference as the tools themselves. An article in MD+DI this week makes a similar case for the final phases of DFSS in medical devices.

The anchor: The DFSS (Predictive Engineering) Flowchart

DFSS Predictive Engineering flowchart from charter and VOC through requirements flow-down, transfer functions, optimization and verification

When I assemble a proposed DFSS Green Belt program, I use this DFSS Flowchart as a starting point, with the predictive engineering tools and methods in a specific order, but with some flexibility. Some tools and methods build on what comes before; if used too early, some tools and methods can give the team an inflated sense of confidence.

Product development starts with the Voice of the Customer, and "Customer" includes stakeholders: the business executives, the regulatory agencies, and the people who will be affected by the product and who will affect product acceptance. The expectations of these stakeholders are gathered, compiled and prioritized, then translated into measurable requirements. Requirement flow-down carries those requirements from system to subsystem to component; the P-Diagram can help identify the control factors, the noise factors, intended results and the error states.

A key P-diagram insight: if the development team controlled everything, if there were no noise factors, nothing outside their control, they would always achieve the intended results. So if there are things that go wrong or not according to plans, those failures are necessarily due to the noise factors. Robust design means identifying those noise factors, and designing the product or process to be virtually immune to them.

After the team has translated the expectations of the customers into measurable requirements, the team must trust those measurements. Measurement System Analysis tells you how much you can trust your measurement system.

Next come methods and tools to have a robust design: a design you can trust will meet or exceed customer expectations regardless of noise factors outside of your control. Predictive Engineering combines engineering modeling with probabilistic thinking. If the team already has an engineering model they can trust, they can use Monte Carlo simulation and/or variance transmission to predict the distributions for the measurable requirements by showing how variability in the inputs drives variability in the outcomes. I share six ways to reduce the vulnerability to variability and build confidence in successful outcomes. Similar probabilistic modeling applies to the five key manufacturing metrics: yield, cycle time, on-time delivery, throughput and cost.

If the development team does not already have engineering models they can trust, Design of Experiments (DOE) can identify which factors significantly affect the outcomes, and can provide regression equations relating the factors to the measurable requirement outcomes. Combining the regression equations from DOE (or its more advanced version, Response Surface Methodology, RSM) with probabilistic methods is a very impressive and remarkably effective predictive engineering approach. If a requirement is Pass/Fail, Logistic Regression provides a way to optimize the probability of success, such as passing an inspection or test. Multiple Response Optimization builds on DOE and RSM, allowing the team to co-optimize multiple requirements that are affected by some of the same factors.

Design for Reliability and Availability carries the question forward in time, to the probability that a product will continue meeting requirements over time and usage.

In some cases, the company's challenges involve qualitative expectations or other complications that can be addressed using Bayesian Belief Networks, which probabilistically model how both quantitative and qualitative factors influence outcomes. BBNs were the original artificial intelligence.

DFSS candidates learn by doing, by applying these tools and methods to a real challenge, from VOC interviews and requirement flow-downs to using tools and methods that provide impressive results.

— Eric Maass

From the field: Verify, Validate, and Transfer Are Three Separate Jobs

Infographic comparing DFSS, DMADV and DMAIC and stating Verify is not Validate, Validate is not Transfer, and a DFSS tollgate is not a Design Review

In a new MD+DI article, Khalid S. Mekki, PhD, a DFSS Master Black Belt whose career runs from reliability engineering at Ford to DFSS deployment at Baxter Healthcare and MedImmune/AstraZeneca, argues that medical device programs too often fold design verification, design validation and IQ/OQ/PQ into a single DFSS "Verify" box.

His answer is a seven-phase spine: Define, Measure, Analyze, Design, Verify, Validate, Transfer. Validate asks whether the device meets user needs in actual or simulated use, while Transfer covers design transfer, process validation and production readiness. Each user need is traced through CTQs and design outputs to the specific method that will verify or validate it.

Why it matters: the phases follow the same logic as the tools in this week's Anchor. When verification is asked to stand in for validation or transfer, the gaps tend to surface late, in tooling, labeling or the field. Read the full article

Links worth bookmarking

© Proprein Labs 2026. Learn more at 6sigmaexperts.com or connect with Eric Maass on LinkedIn.

Blog

Multiple Response Optimization for a Communication Device

Created on Oct 1, 2026By Dr. Eric Maass

DFSS flow for the Covert device, from House of Quality and finite element simulation to response surface and yield surface modeling and optimization

Originally published in Dr. Eric Maass's Predictive Engineering Newsletter (Design for Six Sigma and Supply Chain Resilience). Dr. Maass is Six Sigma BELT Guru's Master Black Belt certifying partner. Republished with credit.

This edition looks at meeting multiple requirements for a communication device, along with a serendipity surprise.

The anchor: Multiple Response Optimization for a Communication Device

"Flawless Launches!" The Vice President of Research and Development for Motorola's Government and Public Safety group committed his teams to use Design for Six Sigma (DFSS) for all new products, globally. Bob Epsom set a clear goal: each product launch would be a "Flawless Launch": high yield at launch, no supply chain disruptions, and no post-launch issues for at least the first 6 months after launch.

As I prepared to teach DFSS for engineers at the Motorola site in Penang, Malaysia, I tried to make the experience fun, interesting and relevant. I imagined team design challenges they might enjoy as they learned how to use DFSS for new products. Since this site was part of Motorola's Government and Public Safety group, the far-out idea I came up with was to have them work in teams on developing a communication device for SPIES! Secret Agents! I thought that would be so cool!

I shared the challenge, expecting surprise and laughter, but the engineers took it in stride, very casually, as if it were a totally reasonable challenge. As it turned out, the Penang engineering team actually WERE developing a communication device for secret agents: a product called Covert.

A bright young engineer named CC Ooi (Ooi Chin Chin) became the DFSS Black Belt leader for the Covert project, and she coached Ooi Boon Hoong on a DFSS Green Belt project focused on audio aspects while CC focused on ruggedness. A spy needs a rugged communication device to deal with unpredictable and hazardous situations!

During Covert operations, the main risks were that screw inserts at the housing and chassis interface could dislodge, and that the chassis would crack at the screw interface. These were translated into multiple responses:

  • Plastic strain on the right catch and left catch of the housing
  • Screw insert pull-out force from drops and impacts

Mechanical simulation (Finite Element Analysis, FEA) was used with Design of Experiments (DOE) and Response Surface Modeling (RSM). There were 5 design factors to optimize for these multiple responses. The regression equations for each vulnerable mechanical interface were used with Monte Carlo Simulation and an optimization algorithm called OptQuest, along with another approach called Yield Surface Modeling (YSM) for stochastic multiple response optimization.

Optimization was accomplished before building a single physical sample or prototype. The team achieved the ruggedness, robustness and reliability required by covert agents. No redesign or rework was required. The Covert product experienced a Flawless Launch.

— Eric Maass

From the field: FDA Drafts Its First Framework for Surgical Robots

FDA has released draft guidance on premarket submissions for robotically-assisted surgical devices, the agency's first comprehensive framework for evaluating these systems. The guidance covers teleoperated, software-controlled systems where the surgeon directs instruments through a leader-follower control architecture.

Why it matters: the testing recommendations read like a DFSS checklist. For input processing functions such as motion scaling and tremor reduction, FDA wants performance testing that verifies consistent, predictable operation within predefined tolerances, across speeds, directions and positions in the surgical workspace. Control systems should stay stable under representative disturbances, such as an accidental bump of the hand controls, without passing that impulse on to the instruments.

In DFSS terms, the regulator has written out the noise factors on the P-diagram. Teams already modeling how their systems respond to variation and disturbance will find much of this evidence is work they are doing today. Read the full story

Links worth bookmarking

© Proprein Labs 2026. Learn more at 6sigmaexperts.com or connect with Eric Maass on LinkedIn.

Blog

Three Black Belt Projects, Three Predictive Engineering Wins

Created on Sep 14, 2026By Dr. Eric Maass

Summary of the StealthStation S8 DFSS projects in design, reliability and manufacturing

Originally published in Dr. Eric Maass's Predictive Engineering Newsletter (Design for Six Sigma and Supply Chain Resilience). Dr. Maass is Six Sigma BELT Guru's Master Black Belt certifying partner. Republished with credit.

This edition shares three Black Belt projects from a Medtronic site in Colorado that show what happens when DFSS meets real medical device challenges: in software and systems, in reliability and in manufacturing.

The anchor: Three Black Belt Projects, Three Predictive Engineering Wins

One of the most rewarding parts of training DFSS Black Belts is seeing the successful outcomes, and their impact on the product and the people. At the Medtronic site in Colorado, several DFSS (DRM in Medtronic terminology) candidates addressed different aspects of an important new medical product, StealthStation S8. Predictive Engineering helped each of them deliver results that would have been hard to achieve in any other way.

Yvan Paitel: StealthStation software performance (navigation latency)

StealthStation S8 allows the surgeon to perform brain surgery and see his or her actions overlaid on an image from a CT scan or MRI. Latency greater than 250 milliseconds would be noticeable and might distract the neurosurgeon during very intense procedures.

Yvan is among Medtronic's first Software DFSS Black Belts. He identified noise and control factors using a P-Diagram, ran a sequence of designed experiments and Response Surface models, and combined the response surface models with Monte Carlo Simulation to significantly reduce latency: the delay between when the surgeon moves a scalpel and sees it on the display.

Result: Latency went from being noticeable by the neurosurgeon about half the time to being noticeable less than 5% of the time.

Richard Hage: StealthStation reliability

The prior product, StealthStation S7, had a mean time between failures of about 2 years. I might have said, "not bad". Richard performed Pareto analysis of past reliability issues and complaints, identified possible causes of failures and complaints using a Use Condition matrix, and used Monte Carlo simulation of the reliability model he developed to determine how to improve MTBF (Mean Time Between Failures).

Result: Richard's effort doubled the MTBF from 2 to 4 years!

Lou Kucera: StealthStation manufacturing

Lou was one of Medtronic's first DFSS / DRM candidates to apply DFSS approaches to manufacturing and assembly challenges, merging Design for Six Sigma with Lean Six Sigma approaches.

Result: Lou enabled first-time successes in manufacturing and saved Medtronic half a million dollars in the first year alone.

A Hollywood moment

Late in the development cycle, Hollywood came calling. A new Marvel movie was underway, based on a superhero who was a neurosurgeon before a life-changing event. StealthStation S8 was used in an early scene. Medtronic people attended a showing of the movie, Doctor Strange, and cheered during the few seconds that their "baby", StealthStation S8, showed up on the silver screen!

— Eric Maass

From the field: INCOSE's September Journal Leads With AI Risk and Safety

INCOSE released the September issue of its Systems Engineering journal. The lead paper takes a systems-level approach to AI risk and ethics, relevant for teams integrating AI into medical devices or semiconductor processes. Risk assessment at the component level misses failure modes that only appear at the system level. DFSS practitioners have understood that for decades through P-diagrams and system-level transfer functions.

Also in this issue: SysML v2 extensions for safety analysis, model-based cybersecurity for automated vulnerability reporting, and LLM quantization trade-offs for engineering applications.

I keep the INCOSE journal in my working library because systems engineering guidance tends to run ahead of adoption in quality and DFSS practice. What gains traction there often appears later in standards and audit criteria.

Source: INCOSE Systems Engineering Journal, September 2026.

Links worth bookmarking

© Proprein Labs 2026. Learn more at 6sigmaexperts.com or connect with Eric Maass on LinkedIn.

Blog

Your Significant X’s

Created on Nov 19, 2024By Alvin Villegas

The old adage goes: "A problem that is well stated is a problem half-solved" (Charles Kettering). The other half? It hinges on the ability of problem-solving teams or continuous improvement advocates to determine the factors that influence a well-defined problem statement. Filtering these factors is very challenging; a miss in the determination process could decide the outcome of the solution(s).

The process of determining root causes has taken varying forms from the early stages of the Industrial Revolution to the present. In the Six Sigma or Lean Six Sigma discipline, determining the significant factors usually starts in the Measure phase (the M in DMAIC). During this phase, uncovering the root causes means a rigorous walk-through of the process flow, deep dives on the identified factors, and characterizing the process behaviour with statistical tools. It is critical at this stage to exhaust all potential root causes affecting the focus area of an LSS project, and then to probe these "significant X's" in the Analyze phase (the A in DMAIC). A question LSS practitioners commonly ask is: how many significant X's should there be going into the Improve phase (the I in DMAIC)? Is there a magic number?

One project leader in a big FMCG manufacturing company proved that following the DMAIC process will lead you to the right root causes, and that the power of hypothesis testing helps in the sifting process. The project was about streamlining a process that had been established because of quality issues in the past. Six years earlier, the company's quality group had collaborated with the engineering team to set up an off-line bottle rinsing line to mitigate (if not eliminate) the presence of foreign particles in their bottles. Substantial time and effort had gone into designing, commissioning and installing the equipment, and then there was the labour involved in the whole process, plus operations management time. For years it was part of the end-to-end process, until, just recently, a Lean Six Sigma project leader challenged whether it was necessary. The LSS project team realized that the decision to set up the line was a response to quality issues, and that the root causes of the problem had never been fully exhausted, hence the "band-aid solution". The team collected a tremendous amount of data, applied statistical analyses to it (e.g. hypothesis testing), and concluded which of the root causes were indeed causing quality issues. To the team's surprise, out of the fourteen (14) identified root causes, only two (2) factors had a statistically significant effect on the problem at hand. At first, the LSS project lead was a bit doubtful about the results, saying it could not be possible that there were only two (2) significant X's. But nobody had tampered with the data, and the team had strictly followed the LSS process. The team's subsequent actions to address those root causes included redesigning the packaging, reconfiguring the orientation of raw materials during delivery, and working with vendors on complying with quality standards, among others. By the end of implementation, the significant X's had been addressed, which eventually reduced the need for off-line bottle rinsing. The project team also achieved 140% of the committed annualized hard savings.

Is there a real magic number for significant X's? There's none! There's no such thing as too few or too many significant X's… Following the LSS process will lead you to the "valid" root causes.

Blog

The Crossroads – Lean Six Sigma and Design Thinking

Created on Oct 6, 2024By Alvin Villegas

I have long been fascinated by how business process improvement and operational excellence methodologies have evolved over the years. In scholarly and academic circles, the discourse about this evolution is called "management fashion" or "management fad", and it traces back as early as the Industrial Revolution of the 19th century. These methodologies evolved with the changing industrial landscape and moved from the manufacturing sector to the services sector. Take Total Quality Management (TQM), which started as an approach to improving overall product quality by empowering the workforce and focusing intensely on customers' requirements. The early adopters of TQM were mainly from the manufacturing industry, but the approach itself is industry-agnostic, so its diffusion and institutionalization in the services sector was seamless. Moreover, TQM became the umbrella program for anything to do with continuous improvement. Approaches and programs of the '90s, such as Quality Circles, suggestion schemes and 5S, crossed paths with TQM and grew into staple organizational strategies for many industries in the Philippines.

It is in the nature of many management fashions that, at some point in their evolution, they come to be used together, not by design but because market needs make it necessary to integrate them. This brings me to the next potential crossroads of two potent approaches to continuous improvement and innovation: Lean Six Sigma and Design Thinking. I have worked in many industries and practiced continuous improvement long enough in my career to say that Lean Six Sigma is a fusion of elements of Total Quality Management, Statistical Quality Control, the Toyota Production System, Total Productive Maintenance and Industrial Engineering. These methodologies have one thing in common: finding ways to make products and services… faster, better and cheaper. Design Thinking, on the other hand, has a similar intent, but its process centres on empathizing deeply with the needs of the end user and developing solutions through prototyping. The Design Thinking literature describes it as a human-centred approach to innovation, one that does not focus on scientific methods or data analysis. The process is more concerned with the customer's experience once they use the solution that comes out of the Design Thinking exercise, and it iterates until the ideal solution is achieved.

So where will the crossroads be? These seem to be two totally different approaches to continuous improvement, problem solving and innovation. Lean Six Sigma is known for relying on empirical data, observable evidence and scientific methods, while the Design Thinking process revolves around empathy for the end user, ideation and prototyping. The answer lies in Dr. W. Edwards Deming's Plan-Do-Check-Act (PDCA) cycle! Both are grounded in Dr. Deming's popular PDCA cycle.

We know that the foundation of Lean Six Sigma's DMAIC methodology is the PDCA cycle. Now let's look closely at the five stages of the Design Thinking process:

The five stages of Design Thinking, Understand/Empathize, Define, Ideate, Prototype and Test, each with a short description

The framework on which Design Thinking operates has the same simple construct as the PDCA cycle and closely resembles the DMAIC methodology. Mapping the three models shows how they intersect:

Table mapping Lean Six Sigma DMAIC phases to Design Thinking stages and the PDCA cycle: Define, Measure and Analyze to Plan; Improve to Ideate and Prototype and to Do; Control to Test and to Check and Act. Measure and Analyze are marked as having not much focus on data analysis in Design Thinking

Since Design Thinking is a non-linear process, its elements can be integrated practically with the Lean Six Sigma methodology. In the mapping above, both Lean Six Sigma and Design Thinking have a laser-like focus on the Voice of the Customer (VOC). In Lean Six Sigma, we use techniques such as Kano Analysis or Quality Function Deployment to define our VOCs and CTQs (Critical to Quality requirements). Design Thinking, on the other hand, has a powerful technique for unearthing customers' or users' requirements called Empathy Mapping (I'll write more about this in my next article). Using these approaches in an organized way will make VOC determination more defined, even close to granular. Furthermore, in the Improve phase of a Lean Six Sigma project, the Belt would normally facilitate the generation of solutions, which are then prioritized, tested through experiments (if necessary) and pilots, and measured for effectiveness. These are the same processes as Design Thinking's Ideate, Prototype and Test. I believe it will be advantageous for a Lean Six Sigma project leader to leverage the tools and processes of Design Thinking's Ideate, Prototype and Test stages, especially when project solutions won't need deep mathematical modelling or an experimental design such as Response Surface Methodology.

The synergy of the two methodologies can be used in a variety of business situations, whether in product development and design or in business process improvement. As in any management fashion evolution, the integration of Lean Six Sigma and Design Thinking is inevitable; it's really a matter of when and how it will be diffused and adopted across industries. In my assessment, it's just around the corner…

Blog

The Persona in a Continuous Improvement Project

Created on Sep 6, 2024By Alvin Villegas

I was standing in front of an operator, observing the process improvement we had implemented on a production module (a TV line). The project was for a large Japanese consumer electronics company based in Jakarta, Indonesia. While I watched the production process, the operator in front of me began to murmur in Bahasa Indonesia. Apparently, he was complaining about the new production line configuration we had implemented, and he wasn't the only one grumbling. To me, it was nothing; I shrugged and told myself, "Why should I be concerned?" We had achieved a 20% productivity improvement on that project and delivered the savings as promised. The CEO of the company was happy! But looking back, was there anything else we should have done to ease the workers' complaints while still keeping our promise to the CEO, or better yet, to go beyond the target productivity gains?

The management consultant in me focused too much on one persona at the time… and, no surprise, it was the CEO of the company. We designed the processes to achieve the cost savings and productivity targets. We used industrial engineering tools and techniques (including human factors engineering and ergonomics), statistical analysis and the Lean approach to reach our goals. In the process, we relied heavily on our engineering design and our project management and implementation skills, believing that everything would work out our way. We also piloted our solutions with little objection from the control group. We did everything by the book, didn't we? Fast forward several years: I encountered Design Thinking at Big Blue (IBM), where it was then a newcomer in the field of innovation and product and process design. I didn't pay much attention to it, as I was busy spreading the gospel of Six Sigma, Lean, automation and quality improvement in the company. During one of my down times (yes, I did have one!), I came across an article by Tim Brown on Design Thinking, and voilà! The answer to the million-dollar question, "What else should have been done?", was staring me in the face.

Design Thinking was originally developed as a product design and innovation process. It hinges on the principle that the design of products and processes should be customer- or user-centric, or, in Design Thinking terms, "persona"-based. The starting point of the Design Thinking process is the discovery phase, where deeper insights about the persona are unearthed. A variety of methods can be used to gain a deeper understanding of the persona you are designing a product or process for. The more popular and structured approach is Empathy Mapping, a collaborative tool used to organize and synthesize insights into the persona's pain points around the identified problem. Below is the structure of a typical Empathy Map:

Empathy Map template: a persona in the centre surrounded by the quadrants Saying, Thinking, Feeling and Doing, with Goals and Needs boxes below

As with any collaboration tool, a team is convened to discuss and populate the chart with sticky notes (Post-it notes) that answer questions such as:

  • What is the persona saying about their work or process?
  • What do they think about the problem?
  • How does this persona feel about their process?
  • What steps does this persona take to handle the process problem?

The Empathy Mapping session surfaces key pain points that help in the later activities of the Design Thinking process, particularly the "Ideation" (idea generation) phase. To make the discovery phase more effective, the final Empathy Map should be validated by actually observing and interviewing the persona. Whenever possible, the team should conduct a DILO (Day in the Life Of…) of the persona to make the inputs in the Empathy Map concrete.

My earlier projects focused only on what we perceived as effective in achieving the business objectives. As in the consumer electronics project I managed, the solutions were all based on what we knew as engineers. We did use human factors engineering on that project, but it was based on prescriptive standards rather than on the operators' day-to-day circumstances. Worse, we didn't consider the operators an important persona when formulating our solutions. Perhaps by using the Empathy Mapping process and surfacing the pain points of that persona (the operators), we could have generated more ideas, combining improvements that required technical or technology changes with an acceptable working experience for the operators. This could have reduced the complaints from the line, since the manufacturing design would have had an element of user-centricity, and it could have yielded even better productivity and efficiency.

As change agents, we need to be creative and exhaust every possible avenue to drive process improvement. I have run and completed successful business process improvement projects, including the one in this article, but I can't claim that all of them were seamless and problem-free. My moment of serendipity with Design Thinking came too late for me to rectify decisions on previous projects; it was simply a matter of accepting that there is always a better way.

Blog

Overcoming the Challenges of Brainstorming

Created on Mar 12, 2024By Jodl Gayatin

As a Green Belt, the projects you usually lead are "just-do-it" projects where the solutions are fairly straightforward. The necessary action needs no further analysis and is only a matter of implementation.

But occasionally you and your team may face a blank wall. You need to be creative and come up with an innovative solution, generating as many solutions as possible so you can evaluate their viability.

This is where a brainstorming session comes in handy. A brainstorming session generates a workable list that the team can take forward for evaluation.

However, a brainstorming session does not always yield productive results. As a project leader, it is crucial that you steer the team towards a productive session.

Here are some of the most common reasons a brainstorming session might fail, and what you can do to avoid them.

1. Not setting a goal. Your project always has a goal, so why not set one for your brainstorming session? Framing or clarifying the question that needs to be answered might seem obvious, but it is worth the effort to put it up front. What is the goal of the session? Is it to list the top 3 ways to generate website traffic? Is it to list possible enhancements to a new model? Framing the question helps the team decide how much time to devote to the session and establish its success indicators.

2. Not using a method. While a brainstorming session is mostly a free-for-all of idea generation and involves a lot of right-brain thinking, the facilitation process needs structure. This is where your skill as a project leader comes in. Decide on the best tool to facilitate your session. In my experience, the most effective ones are SCAMPER, Mind Mapping, Anti-Solution and Six Thinking Hats.

3. No pre-work done. Some team members might think the session is just a series of rambling and sharing, and some could come unprepared. The best way to start the session and get the ball rolling is to assign a bit of pre-work. For example, before the actual meeting, ask the members to come up with 1 or 2 ideas aligned with the question being asked.

4. No follow-through. The brainstorming session is not an end in itself. Once you have generated a list at the end, you need to follow up to ensure that the proposed solutions are evaluated (there are several tools for this as well, such as the PICK matrix).

5. Too many or too few members. The number of members can ultimately dictate the number of proposals to evaluate at the end. An additional member can have a synergistic effect on the ideas. Too many members, though, can be hard to facilitate, and an hour or two will not be enough to cover everyone. The workable number is around 5 to 6.

6. Too many distractions. Successful brainstorming sessions require focus. The last thing you want is distracted members who keep checking their mobile phones for messages, or members who step out for a few minutes to respond to operational concerns. Implement a closed-door, no-outside-communication policy so that all effort and attention go to the session.

7. Not in the proper mindset. The most innovative solutions require a spark of creativity and ingenuity. They require lateral thinking. You won't know where that insight will come from, but you can prime your team members for lateral thinking by giving them out-of-the-box thinking puzzles ahead of the session or in its first few minutes. Popular puzzles include the Completion Test, the Word Association Test and the Incomplete Picture.

A successful brainstorming session can ultimately determine the best solution to the problem at hand and have a tremendous impact on the success of a project. As a Green Belt practitioner, make sure you avoid the pitfalls above so you can make the most of your session.